1 INSTALLATION AND OWNER’S MANUAL As of date of manufacture, meets all ANSI/UL 325 Safety Requirements for Vehicular gate operators HDSWG 1000 Heavy D
10 PLACING THE HDSWG 1000 MECHANICAL UNIT Remove the rain seal from the shaft of the HDSWG 1000. SAVE IT! The rain seal will be used later. Next
11 INSTALLING THE HDSWG 1000 CONTROL BOX The HDSWG 1000 CONTROL BOX may be mounted remotely from the MECHANICAL UNIT. Four mounting holes are provid
12 CONNECTING THE AC WIRING 115 VOLT INSTALLATIONS: Starting at the HDSWG 1000 4 x 4 handy box proceed as follows: 1. The BLACK wire attaches to
13 Figure 12: Left/Right Hand Installation Limit & Motor Wiring Diagram C: INSTALLING THE OPERATOR
14 Figure 13: Bi-Parting Installation Limit & Motor Wiring Diagram C: INSTALLING THE OPERATOR
15 The Limit Switch contacts of the two Bi-Parting units need to be wired in series. Both limit switch contacts must be closed before a connection is
16 THREE TERMINAL RECEIVERS If a three terminal receiver is to be used, the #1 terminal of the receiver is normally COMMON to both the auxiliary tran
17 WIRING A KEYPAD, CARD READER OR TELEPHONE ENTRY SYSTEM These devices activate the HDSWG 1000 by a relay contact closure within the device. Typic
18 # NAME DESCRIPTION 1 LOCK SOLENOID 2 LOCK SOLENOID 3 COMMON One of (2) board commons provided on the terminal strip 4 CLOSE LIMIT SWITCH Use
19 SETTING THE LIMIT SWITCHES RIGHT-HANDED OPERATION With the cover removed from the HDSWG 1000 MECHANICAL UNIT, and the arm connected to the gate as
2 Pre-Installation Notes ... 3 Section A: Installation Notes ...
20 TIMER TO CLOSE SETTING The Timer to Close is controlled by the switch in position #3. If Switch #3 is set OFF, the Timer to Close function will op
21 Triac Light stays ON. Lock light is ON. 6. Terminal #6, Stop,: Both Open and Close Triac lights are momentarily ON, then both Open and Close Tria
22 MAXIMUM RUN TIMER The HDSWG 1000 is equipped with a Maximum Run Timer that is Factory set to turn the HDSWG 1000 OFF if a Limit Switch command is
23 You are now ready to install and connect the ancillary equipment. INSTALLATION STEPS DETAILED IN SECTIONS A, B, C AND D MUST BE COMPLETE BEFORE PR
24 To the Owner/End User of Allstar’s HDSWG 1000: Thank you for choosing an Allstar product. We are confident you will have many years of use and sa
25 AVOID ENTRAPMENT: Stay away from the path of the gate and all moving parts (gate arms, etc.) at all times. Keep clear of the pinch points identif
26 1 2 3 4 5 7 6 8 9 10 11 12 13 14 15 16 17 18 19 20 106359 Figure 24: HDSWG 1000 Mechanical Unit Exploded View MECHANICAL UNIT EXPLODED VIEW
27 ITEM # PART # DESCRIPTION 1 10291 RAIN SEAL RUBBER RING 2 104442 RAINSEAL PLATE 3 10279 OPERATOR COVER 4 10221 ROLLER CHAIN 5 104452 OU
28 c.p. Allstar Corporation Downingtown, PA 19335 This Gate Operator is built in the USA and complies with all requirements of Underwriters' Lab
3 WARNING HIGH VOLTAGE ONLY A QUALIFIED TECHNICIAN SHOULD SERVICE THIS GATE OPERATOR PERIODICALLY TEST SENSITIVITY OF OVERLOAD *** READ MANUAL ***
4 TO REDUCE THE RISK OF SEVERE INJURY OR DEATH: READ AND FOLLOW ALL INSTALLATION INSTRUCTIONS AND GATE SYSTEM DESIGN PARAMETERS! WARNING! GATE SYSTEM
5 •Check the operator manufacturer’s specification to ensure that the operator is proper for the cycles per hour, size and type of gate. •USE EXTREME
6 The standard HDSWG 1000 is designed to operate a single leaf gate. The control box and mechanical units are separate devices. It is necessary to f
7 For saw-cut installations, observe the methods recommended in Figure 7, above. The saw-cut must be to a depth of 1.5", clean and with no shar
8 electrical service depends on the distance of the operator from the breaker panel. Refer to Table 1 to determine the correct wire size. The NOMIN
9 Mechanical Unit Electrical Unit Wood Pallet with 4 lag bolts Instruction Kit Instruction Manual Warning signs Swing Arm Kit Swing Arm Crank
Comments to this Manuals